Tuscaloosa · issues
Civic issues
Topics getting the most attention in Tuscaloosa public meetings, ranked by how frequently they come up.
2027 Severe Weather Preparedness Tax Holiday
A sales tax holiday for certain covered items in 2026 was up for introduction, and could be adopted the same night — a small break for back-to-school-style shoppers.
Riggs Rd and 31st St drainage improvements
A $199,442 engineering contract to fix standing water in West Tuscaloosa near Alpha Joe Mabry Hill, paving an open channel that was never paved and reducing mosquito and maintenance problems.
Cypress Creek Phase III drainage stabilization
An $863,250 engineering contract to stabilize eroding creek banks, protect utilities, and fix culverts along a mile-long stretch south of Skyland Boulevard. Design will take at least a year with complex permitting.